C Building Task Force

C-building Taskforce Committee 

The purpose of the C-Building Renovation Project is to ensure that the building maintains its identity as Bellevue College’s student HUB by better utilizing the existing space of the C-Building in order to meet the current and future needs of the student population and student-related programs. 

This project is a student-led project being overseen and managed by ASG. The areas of the C-Building being considered for renovation are areas of the building that are managed by student programs, with the exception of a small number of public spaces (such as bathrooms and updating building navigation in hallways).

For more information please visit: C-Building Renovation Taskforce Bylaws

Allocations: 

Bathroom Renovations – $429,780.77

Budget breakdown: 2022-556 Bellevue College Building C Bathroom Remodel [PDF]

Minutes